Water Treatment · Municipal · Industrial Water

BOMs and permits
in hours, not weeks.

Built for water treatment teams. Ranger extracts BOMs and structures permit packages from your design documents — so procurement starts on time.

Book a meeting
0%
Faster BOM extraction
Across active deployments
< 3 hrs
Full BOM from treatment specs
vs. 2–4 days manually
0%
Reduction in manual data entry
Per project cycle
0 days
To measurable results
Average pilot timeline
How It Works

From treatment design
to procurement-ready output.

Three steps. Built for how water treatment projects actually run.

Step 01

Ingest Design Documents

Ranger learns your project once. Upload P&IDs, equipment schedules, treatment design reports, and approved equipment lists.

P&IDs and process flow diagrams
Equipment schedules & design criteria
Approved equipment lists & vendor data
Step 02

Agents Extract & Validate

Ranger automatically extracts equipment tags, capacities, and specs from your drawings — cross-referencing against approved lists and flagging any discrepancies.

Parse equipment tags, capacities & specifications
Cross-reference against approved equipment lists
Flag discrepancies with source drawing citation
Step 03

Procurement-Ready Output

Complete BOM structured in under 3 hours. Equipment spec sheets for supplier RFQ. Regulatory submission packages structured — no data entry required.

Structured BOM ready in under 3 hours
Equipment spec sheets for supplier RFQ
Regulatory submission package structured automatically
The Difference

Same design package.
Completely different outcome.

What actually changes when a water treatment team runs on Ranger.

Without Ranger

Treatment design finalized — engineers begin manual BOM extraction

Days of cross-referencing P&IDs and equipment schedules by hand

Transcription errors affect procurement decisions

Schedule delays ripple — re-work consumes valuable engineering time

Outcome
2–4 day extraction. Schedule at risk.
With Ranger

Treatment design finalized — Ranger reads specs and drawings

Equipment parameters extracted and structured automatically

Complete BOM generated in under 3 hours — cross-referenced to approved lists

Engineer reviews and validates — procurement starts on time

Outcome
Under 3 hours. Schedule maintained.
BOM extraction time
Without Ranger2–4 days
With RangerUnder 3 hours
~94% faster— same team, same design package
What Ranger Does Here

Three workflows.
Immediate results.

BOM EXTRACTION

Extract complete BOMs from treatment specs — automatically.

Complete BOM extracted in under 3 hours
Quantities and specs pulled directly from drawings
Automatic cross-reference to approved equipment lists
REGULATORY SUBMISSIONS

Meet permit requirements without the documentation scramble.

Permit packages structured automatically
Gap analysis against regulatory requirements
Full traceability to source engineering records
EQUIPMENT SPECIFICATIONS

Generate equipment specs your suppliers can actually quote.

Equipment specs generated from design documents
Consistent format across all equipment categories
Supplier RFQ packages ready in hours

We expected performance improvements, but the strategic implementation delivered unprecedented operational excellence.

Teleb
Celeros

FAQ

Common Questions

Water Treatment · Municipal · Industrial Water

Ready to keep every
project schedule
on track?

Book a 30-minute call. We'll walk through the exact workflows built for your operation — your specs, your requirements, your language.

Book a meeting